Interstate 440 (North Carolina)
This article needs additional citations for verification. (October 2023) |
Template:Good Article Template:Infobox road Interstate 440 (I-440), also known as the Raleigh Beltline, the Cliff Benson Beltline, or locally as The Beltline, is an Interstate Highway in the US state of North Carolina. I-440 is a 16.4-mile-long (26.4 km) partial beltway that nearly encircles central Raleigh. I-440 begins in west Raleigh at an interchange with I-40 as a continuation of U.S. Highway 64 (US 64)/US 1 and traverses a primarily residential area in west Raleigh. The freeway makes a turn toward the east, crossing US 70, Six Forks Road, and Wake Forest Road. US 1 branches north off I-440 at US 401 (Capital Boulevard), becoming US 401/US 1. I-440 turns toward the southeast and follows a brief concurrency with U.S. Highway 64 Business (US 64 Bus.) before intersecting I-87/US 64/US 264. US 64 and I-87 are concurrent with I-440 along the remainder of the road's southwesterly routing. Exit 16 is the last exit on I-440, where I-440 splits to join either I-40 eastbound or I-40 westbound.
The Raleigh Beltline was formed from a number of highway segments, the earliest of which had been in place since 1959. The loop was completed in 1984 under multiple route designations. To avoid confusion along the beltline, I-440 was routed along the entirety of the beltline and shared a concurrency with its parent, I-40, along the loop's southern segment (Tom Bradshaw Freeway). In 2008, the I-440 designation was removed from the section of I-40/US 64 in southeast Raleigh. The highway's original "inner" and "outer" designations were also removed and replaced with compass directions (e.g., east/west). The easternmost two miles (3.2 km) of the I-440 was rebuilt in 2015 as part of the larger widening project along I-40 in South Raleigh, while the westernmost four miles (6.4 km), the oldest segment and one which is not up to Interstate standards, is currently undergoing widening and upgrading and is scheduled to be complete by 2023.[citation needed]
Route description
I-440 begins on the western side of Raleigh at an interchange between I-40/US 1/US 64 (exits 1A and 1B), heading northeast concurrently with US 1. US 1/US 64 continues to the southwest on the same freeway. The freeway has an interchange with Jones Franklin Road (exit 1C) just over 0.5 miles (0.80 km) from its western terminus. Continuing northeast, the freeway runs between residential neighborhoods and has a partial interchange with Melbourne Road (exit 1D). Exit 2 provides access Western Boulevard, a major arterial road that connects west Raleigh with north Cary. From there, the freeway slowly begins to turn toward the north and completes the turn after a partial cloverleaf interchange with NC 54 (Hillsborough Street) at exit 3. North of that interchange, the freeway continues west of Meredith College and east of North Carolina State University's Centennial Biomedical Campus. East of there, exit 4 is a cloverleaf interchange with Wade Avenue, which provides access to PNC Arena and Carter–Finley Stadium. The freeway turns slightly to the northeast to have an interchange with Lake Boone Trail (exit 5). Approaching US 70, the freeway makes another slight turn toward the northeast. An incomplete interchange at exit 6 serves Ridge Road directly before the US 70 cloverleaf interchange at exit 7. From there, the freeway turns to the east and runs between more neighborhoods in the North Hills area of Raleigh. After an interchange with Six Forks Road (exit 8), which provides access to the North Hills shopping center, I-440 turns southeasterly.<ref name="GoogleMaps"/><ref name="2015-16 map">Template:Cite map</ref>
The freeway passes south of Duke Raleigh Hospital after an interchange with Wake Forest Road (exit 10). Continuing to the southeast, the freeway crosses over Atlantic Avenue along with a railroad operated by CSX Transportation. Turning again to the southeast, a cloverleaf interchange at exit 11 provides access to US 401 (Capital Boulevard), which marks the end of the US 1 concurrency, as US 1 turns to the north to join Capital Boulevard. The freeway begins to parallel Crabtree Creek as it continues southeast. At exit 12, there are two incomplete exits: Yonkers Road is served by I-440 eastbound, while Brentwood Road and Noblin Road are served by I-440 westbound. A partial cloverleaf interchange at exit 13 serves New Bern Avenue along with US 64 Bus. eastbound. US 64 Bus. is concurrent with I-440 until exit 14. Immediately before reaching I-87/US 64/US 264 at exit 14, the freeway turns directly south. The freeway, along with several exit ramps, crosses over Crabtree Creek and a railroad owned by the Carolina Coastal Railway. US 64 continues concurrently with I-440 to the south. After an interchange with Poole Road (exit 15), the Interstate turns to the west along the southern side of Walnut Creek Park. Exit 16 is the last exit on I-440 and is used to serve I-40 eastbound. I-440 and I-87 continue to the west another 0.7 miles (1.1 km) before both terminating at I-40 westbound. US 64 continues concurrently with I-40.<ref name="GoogleMaps"/><ref name="2015-16 map" />
History
The Raleigh "Belt Line" was planned during the early 1950s as a beltway around the city.<ref>Little, Ruth (August 2006). "The Development of Modernism in Raleigh, 1945–1965" (PDF). NC Modernist Houses. NC Modernist Houses. Archived (PDF) from the original on June 26, 2016. Retrieved July 31, 2016.</ref> By 1953, funds had been set aside for the portion between New Bern Avenue and North Boulevard (later renamed to Capital Boulevard).<ref>"Belt lines discussed: Raleigh given roads pledge". News and Observer. Raleigh. July 8, 1953. p. 26.</ref> In September 1962, the first portion opened to traffic. This was the section from NC 55 in Apex to Western Boulevard in Raleigh.<ref>"Beltline link opened here". News and Observer. Raleigh. January 30, 1963. p. 20.</ref> A few weeks later, another short section opened up to Hillsborough Street, just in time for the State Fair.<ref>"Raleigh to Apex link to open on Beltline". News and Observer. Raleigh. October 10, 1962. p. 26.</ref> The following January, the portion from Hillsborough Street to Glenwood Avenue opened.<ref>"Beltline link opened here". News and Observer. Raleigh. January 30, 1963. p. 20.</ref> At this time, the freeway was signed as US 1 from Apex to Hillsborough Street. From there, US 1 followed Hillsborough Street east toward downtown. The remaining 3.3-mile-long (5.3 km) section of the freeway,<ref name="hillsbourughstreettogleenwoodavenue">Template:Google maps</ref> running from Hillsborough Street north to Glenwood Avenue, remained unsigned.<ref name=1961map>Template:Cite map</ref><ref name=1963map>Template:Cite map</ref>
Later in 1963, the northern section of the Raleigh Beltline was completed from Glenwood Avenue to North Boulevard (Capital Boulevard) where it met up with US 401. US 1 was then signed along the freeway from Hillsborough Street to North Boulevard, leaving its former routing through downtown Raleigh as US 1 Bus.<ref name="1963map"/><ref name=1964map>Template:Cite map</ref> The next year, US 64 was relocated to bypass Cary and connect with the US 1 freeway six miles (9.7 km) northeast of Apex.<ref>Template:Cite map</ref> Also in 1964, a two-mile-long (3.2 km) section of the Beltline opened, extending the freeway all the way to New Bern Avenue. US 64 was rerouted along the Beltline from just north of Apex to New Bern Avenue, where it (US 64) turned toward the east. The former routing of US 64 through downtown Raleigh became known as US 64 Bus.<ref name=1964map/><ref name=1965map>Template:Cite map</ref>
The route remained unchanged until September 1972, when US 70/NC 50 was relocated from its routing along Glenwood Avenue and placed along the beltline from the Glenwood Avenue exit to North Boulevard, where the two roads then turned to the south and followed US 401 into downtown Raleigh.<ref>"US and NC Route Change (1972-09-07)" (PDF). North Carolina Department of Transportation. September 7, 1972. Archived (PDF) from the original on March 4, 2016. Retrieved June 10, 2016.</ref> In 1975, construction began on a new extension of the beltline, which was to run from New Bern Avenue southwest to Hammond Road in south Raleigh.<ref name=1974map>Template:Cite map</ref><ref name=1975map>Template:Cite map</ref> By 1976, plans to extended the road from New Bern Avenue south and then west to US 70/US 401/NC 50 (South Saunders Street) were formalized.<ref name="1975map"/><ref name=1976map>Template:Cite map</ref> The first leg of the new construction was opened later that year, extending the freeway south to Poole Road.<ref name="1976map"/><ref name=1977map>Template:Cite map</ref> In April 1984, the construction of the beltline along the southside of Raleigh was completed. US 70/US 401/NC 50 was rerouted from Downtown Boulevard (formerly North Boulevard, now called Capital Boulevard) along the eastside of the beltline to South Saunders Street, where both routes followed the road south toward Garner. The route change left the former routings through downtown Raleigh as secondary roads. US 64 was removed from the northern side of the beltline and placed along the new southern side from US 1 near Cary to New Bern Avenue. I-40 was rerouted from present-day Wade Avenue and along the new construction before ending at US 1.<ref>"Route Changes (1984-04-01)" (PDF). North Carolina Department of Transportation. April 1, 1984. Archived (PDF) from the original on February 7, 2017. Retrieved June 11, 2016.</ref>
In 1991, state highway administrator William G. Marley Jr. asked the Federal Highway Administration to call the Raleigh Beltline I-440.<ref name="Confused">Hoar, Stephen (August 19, 1991). "Beltline Signs Aim to Aid Confused". The News & Observer. Raleigh, NC. p. A1.</ref> On July 16, 1991, I-440 was officially designated as a new beltway running along the entirety of the existing beltline. The new Interstate was cosigned with I-40 along the southside of Raleigh between exit 293/exit 1—where I-40, I-440, US 1, and US 64 met near Cary—and exit 301/exit 16, where I-40 turned to the south. I-440 was also cosigned with US 1 from exit 1 to Capital Boulevard (formerly Downtown Boulevard). US 64 was also signed along a brief concurrency with both I-440 and US 1 from exit 1 to Western Boulevard, where it turned east toward downtown. US 70, US 401, and NC 50 were rerouted from their beltline designations through downtown Raleigh, causing worries about traffic on downtown streets.<ref name="Ref-1"/><ref name="Rawlins">Rawlins, Wade (September 4, 1992). "Diverting Beltline Traffic Puts Load on Downtown". The News & Observer. Raleigh, NC. p. B2.</ref>
That year, work began on a seven-year, $53-million (equivalent to $Template:Formatprice in 2022<ref name="inflation-USGDP" group="">Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series. </ref>) project to expand the beltline to six lanes (three in each direction).<ref name="Wake" /><ref name="Early" /> Work in 1991 included widening a 3.6-mile-long (5.8 km) section of I-440 from Glen Eden Road to Wake Forest Road and rebuilding of the 30-year-old Glenwood Avenue bridge.<ref name="Early" /><ref>Hoar, Stephen (August 19, 1991). "Beltline Drivers to Face Lane Shift at Bridge Site". The News & Observer. Raleigh, NC. p. B4.</ref> Work began in early in 1993 to widen 4.4 miles (7.1 km) from Wake Forest Road to New Bern Avenue.<ref name="Wake">Hoar, Stephen (January 26, 1993). "Next Beltline Phase to Start Work to Tackle Wake Forest to New Bern". The News & Observer. Raleigh, NC. p. B4.</ref> On July 8, 1994, the state awarded the contract for widening 1.7 miles (2.7 km) to six lanes from Wade Avenue to Glen Eden Road. At that time, completion of the project's second phase was expected by June 1995, with phase three scheduled for completion in 1996. The two-mile (3.2 km) section between New Bern Avenue and Poole Road were widened starting in 1996. Plans called for widening the section from Wade Avenue to I-40 several years later,<ref name="Early">Hoar, Stephen (July 9, 1994). "Beltline Widening Accelerates". The News & Observer. Raleigh, NC. p. B4.</ref> but, even after several delays,<ref>Eisley, Matthew (November 13, 1998). "State Delays Major Raleigh Transit Projects". The News & Observer. Raleigh, NC. p. B3.</ref><ref>Siceloff, Bruce (November 30, 2004). "4-Lane Stretch Won't Be Widened Soon". The News & Observer. Raleigh, NC. p. B1.</ref> the 2006–2012 NC Transportation Improvement Program did not include funding for the $77.3-million (equivalent to $Template:Formatprice in 2022<ref name="inflation-USGDP" group="">Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series. </ref>) upgrade.<ref>Siceloff, Bruce (March 27, 2005). "Road Plan Imperils Triangle Projects". The News & Observer. Raleigh, NC. p. A1.</ref> The project was considered complete in 1997 except for the delayed section.<ref name=":0">"I‐440 Improvement Project" (PDF). North Carolina Department of Transportation. September 2014. Archived from the original (PDF) on January 25, 2017. Retrieved June 10, 2016.</ref>
The original I-440 designation used "inner" and "outer" labels rather than east and west labels because the freeway made a full loop around the city. "Inner" was used to designate the clockwise direction around the beltline, and "outer" was used to designate counterclockwise.<ref>Hyman, Vicki (August 8, 2000). "A Tip for the Confused: Pretend I- 440 is a Clock". The News & Observer. Raleigh, NC. p. B1.</ref> In 2008, State Highway Administrator W. F. Rosser asked the US Department of Transportation to remove the I-440 designation from the southern portion of the beltline, where it was cosigned with I-40. This decision was primarily made to prevent confusion of travelers who used the highway. On November 10, 2008, I-440 was officially truncated on the western end at the I-40/US 1/US 64 interchange in western Raleigh and at the I-40 interchange in southeast Raleigh. The inner and outer labels were also dropped and replaced with east and west designations.<ref>"Route Changes (2008-11-10)" (PDF). North Carolina Department of Transportation. November 10, 2008. Archived (PDF) from the original on February 7, 2017. Retrieved June 11, 2016.</ref><ref name=Redesigned>Siceloff, Bruce (August 24, 2008). "Redesigned Beltline Signs to Drop 'Inner' and 'Outer'". The News & Observer. Raleigh, NC. p. A1.</ref> The Federal Highway Administration route log has been updated to show the shortened distance.<ref name="fhwa" /> By 2010, the entirety of the highway's signs had been changed to the new designation.<ref>"I-440 Drops 'Inner' and 'Outer' Labels". WRAL.com. Raleigh: WRAL-TV. March 29, 2010. Archived from the original on August 8, 2016. Retrieved June 12, 2016.</ref>
I-440 was included in Project Fortify, a $130-million (equivalent to $Template:Formatprice in 2022<ref name="inflation-USGDP" group="">Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the Measuring Worth series. </ref>) project to replace pavement along the southern beltline, which was crumbling due to a chemical reaction known as alkali–silica reaction (ASR).<ref>"Road Worrier: NC DOT Says to Not Worry About 3 Years of Beltline Misery—Be Happy!". The News & Observer. Raleigh, NC. Archived from the original on June 22, 2016. Retrieved June 12, 2016.</ref> I-440 was included in the first phase of the project, which included replacing the freeway's pavement from the I-495/US 64/US 264 exit to the eastern terminus of the freeway at I-440. Lane closures on the approximately two-mile-long (3.2 km) section of the beltline began in December 2013.<ref>""Crawleigh" Hits I-440 this Week". Raleigh Public Record. Archived from the original on September 19, 2016. Retrieved June 12, 2016.</ref> The project's first phase was completed in early 2015, with the I-40 section of the project expected to be completed in 2017.<ref>"About Fortify I-40/440 Rebuild Project". North Carolina Department of Transportation. Archived from the original on June 5, 2016. Retrieved June 12, 2016.</ref>
Future
The North Carolina Department of Transportation (NCDOT) has designated a 3.5-mile (5.6 km) stretch of I-440, from Walnut Street to Wade Avenue, to be redesigned and widened to six lanes. Completed in 1960, it is the oldest section of the beltline; it features the original four lanes with minimal shoulders, substandard interchanges, and a merging left-lane onramp. A Purpose and Need Statement was completed in 2014, showing the need for the project through deficiencies in capacity, geometric (design of the roadway and interchanges), and road condition.<ref name=":0" /> NCDOT initially planned to spend $92 million, beginning with right-of-way acquisition in 2018.<ref>"I-440 Improvements". North Carolina Department of Transportation. Archived from the original on June 5, 2016. Retrieved June 10, 2016.</ref> The project began in earnest in late 2019<ref>Chaplin, Josh (November 11, 2019). "I-440 ramp to Wade Avenue closed for 2 years". ABC11 Raleigh-Durham. Retrieved May 13, 2023.</ref> and is expected to be complete by mid-2023, with a revised cost estimate of $475 million. Concurrent with the widening of I-440 will be a redesign of Blue Ridge Road, which parallels this section of I-440, as well as new overpasses for several crossing streets and railroads.<ref>"I-440 & Blue Ridge Road Improvements". NCDOT.com. North Carolina Department of Transportation. Archived from the original on September 25, 2019. Retrieved November 14, 2019.</ref> New bridges at the interchange opened in April 2023.<ref>"New traffic pattern at Raleigh's Wade Ave.: New bridges open, lanes and ramps close Friday night". WRAL.com. April 21, 2023. Retrieved May 13, 2023.</ref>
As part of the widening project of I-40 to relieve the heavy traffic, the I-40/I-440/US 1/US 64 interchange is being redesigned. Construction on the projects is expected to begin in 2025 at a cost of $68.8 million.<ref>Shrader, Brian (March 16, 2023). "NCDOT plans to redesign 440 interchange, widen I-40 in Raleigh in 2025". WRAL.com. Retrieved May 13, 2023.</ref>
Exit list
Template:Jcttop Template:NCint Template:NCint Template:NCint Template:NCintTemplate:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:NCint Template:Jctbtm